- finish wiring buggy from scratch
- test wiring, fix anything that doesn't work
- install steering column
- install dash
- final align axles to chassis, make sure it's all square
- cut down extra length of bolts at link connections
- put in heat shield on backside of interior panels
- install driveshafts
- install panels, seats, center console, seatbelts, etc... Finish assembly
- put in brake fluid, bleed brakes
- put in gear oil
- N2 in shocks
- test drive, pray that everything works
- put water in front tires
- load on trailer

- pray that Dodge and trailer and Lynda's Jeep are good to go...